Topic area
Monitoring and control
Terms for monitoring and control: plan-versus-actual comparison, earned value, forecasts, changes and actions that keep a project on course.
- Actual costISO 21506 · 3.3Costs actually incurred for the project work carried out up to a cut-off date.
- Actual costPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)In earned value management, the figure showing what the work completed up to a status date has really cost.
- BaselineISO 21506 · 3.4Approved version of a plan for scope, schedule or cost against which actual project progress is measured.
- BaselinePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Frozen, approved version of a plan or work product that actual progress is measured against and that only an authorized change may alter.
- Budget at completionISO 21506 · 3.7Approved total budget for completing all the work of an activity, work package, control account, project or programme.
- Budget at completionPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Total budget for the planned work of a project or part of it; in earned value management, the planned value to be reached at completion.
- Change AuthorityPRINCE2 · Praktik OrganisationPRINCE2 role to which the Project Board delegates decisions on requests for change and off-specifications within defined limits.
- Change controlcross-frameworkDefined procedure by which changes to scope, schedule, costs or results are recorded, assessed, decided on and implemented
- Change controlPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Regulated route by which every proposed change to baselines, deliverables or documents is reviewed, decided on and recorded traceably.
- Change control boardcross-frameworkBody that reviews change requests in a project and decides whether to approve, reject or defer them
- Change control boardPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Body with a formal mandate that weighs up change requests and decides whether to approve, postpone or turn them down.
- Change registerISO 21506 · 3.9Continuously maintained overview of all changes raised in a project or programme, with their key details and current status.
- Change requestISO 21506 · 3.10Proposal, submitted in writing, to change a project or programme, stating reasons and effects and put forward for a decision.
- Change requestPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Formal application that submits a desired change, with reasons and likely effects, to change control for a decision.
- Configuration managementISO 21506 · 3.12Managing the components, versions and characteristics of a project result so that it is always clear which version applies.
- Configuration management systemPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Framework of procedures stating which project artifacts are under version control and how their valid state and any changes to it are safeguarded.
- ControlISO 21506 · 3.13Ongoing comparison of the project's status with the plan and initiation of action when variances put the objectives at risk.
- Control accountISO 21506 · 3.14Point at which the work content, schedule, budget and actual costs of one part of a project come together and are owned jointly.
- Control accountPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Chosen point in the WBS with its own responsible person where planned and actual data meet and performance is assessed using earned value.
- Controlling a stagePRINCE2 · ProzessePRINCE2 process in which the project manager runs a stage: assigning work, checking progress, reporting and responding to deviations.
- Corrective actionISO 21506 · 3.15 und 3.16Action that remedies a variance that has already occurred; in quality management, removing the cause of a defect so that it does not recur.
- Corrective actionPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Response to a deviation that has already occurred; it tackles the cause and brings project work back to what the project management plan lays down.
- Cost performance indexcross-frameworkRatio of earned value to actual cost; values below one mean that the project is working at higher cost than planned
- Cost performance indexPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Cost efficiency indicator obtained by dividing earned value by actual cost (CPI = EV / AC).
- Cost varianceISO 21506 · 3.17Difference between the value of the work performed and the actual cost incurred for it; a negative value means more expensive than planned.
- Cost variancePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Budget deviation at a status date, found by subtracting actual cost from earned value (CV = EV − AC).
- Data datePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Status date at which project progress is captured; in the schedule it separates recorded actuals from the remaining plan.
- Earned valueISO 21506 · 3.21Monetary value of the work actually finished by a cut-off date, measured with the budget that was planned for that work.
- Earned valuePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Budgeted value of all work actually completed up to a given date.
- Earned value managementISO 21506 · 3.22Method for judging how far and how efficiently a project or programme has progressed by combining scope, schedule, budget and actual cost.
- Earned value managementPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Method linking scope, schedule and resources so that the progress and performance of a project can be measured objectively and forecast.
- Earned value management planningISO 21506 · 3.23Preparatory planning that sets out how a project builds its measurement of performance: baseline, crediting rules, responsibilities and reports.
- Earned value measurementsISO 21506 · 3.24Figures from which the earned value of a project or programme is derived and interpreted for control purposes.
- Estimate at completionISO 21506 · 3.25Forecast of the total cost a project, a programme or part of one will have incurred once all its work is finished, based on the current position.
- Estimate at completionPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Forecast of total cost at project end: costs incurred so far plus the expected cost of the remaining work (EAC = AC + ETC).
- Estimate to completeISO 21506 · 3.26Expected cost of all the work still outstanding at the cut-off date, for example in a project or a single work package.
- Estimate to completePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Forecast of the costs still to come from the status date onwards until all outstanding project work is done.
- ForecastPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Reasoned projection of how a project’s costs, dates or scope will develop, updated whenever new data become available.
- GateISO 21506 · 3.18Decision point between two project phases at which continuation, adjustment or termination is decided.
- Integrated baseline reviewISO 21506 · 3.30Joint review by client and project team of whether the performance measurement baseline is complete, realistic and understood alike by all.
- IssueISO 21506 · 3.31Problem or unresolved question that has already arisen in a project and must be dealt with and decided so that work can continue.
- IssuePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Problem or open point that already exists, may endanger a project objective and so must be tracked by an owner and resolved.
- Issue logPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Project document for capturing issues and following them up, with owner, status and resolution for each.
- Issue Management ApproachPRINCE2 · Praktik IssuesPRINCE2 7 management product defining how issues and changes are captured, assessed, decided and followed up.
- Issue registerISO 21506 · 3.32Document in which all issues of a project or programme are recorded together with actions, owners and status.
- Issue RegisterPRINCE2 · Praktik IssuesPRINCE2 register for the issues handled formally: requests for change, off-specifications, and problems or concerns.
- Issues practicePRINCE2 · Praktik IssuesPRINCE2 7 practice for handling unplanned events, change requests and deviations that require a decision.
- Management information systemISO 21506 · 3.35Hardware and software that gathers data from projects and programmes and turns it into analyses and reports for decision-makers.
- Managing a stage boundaryPRINCE2 · ProzessePRINCE2 process at the end of a stage: assessing results, planning the next stage, updating the business case and preparing authorization.
- Monitor & ControlPM² · Abschnitte 3.2.5 und 9In PM², the activities spanning all phases with which the Project Manager measures performance, detects deviations and takes corrective action
- Percent completecross-frameworkShare of the planned work of an activity, work package or project that has been performed by a given date, usually as a percentage
- Percent completePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Assessment, given as a percentage, of what share of an activity’s or work package’s work has been done.
- Performance measurement baselineISO 21506 · 3.44Measurement basis of earned value management: the plan of work and budget spread over time, leaving out the management reserve held back.
- Performance measurement baselinePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Combined baseline of scope, schedule and cost that serves as the yardstick for measuring project performance.
- Phase GatePM² · Abschnitt 3.2.6Approval point at the end of a PM² phase at which it is checked whether the project may move on to the next phase
- Phase gatePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Formal decision point between two phases at which an authorized body uses the phase results to decide how the undertaking proceeds.
- Planned valueISO 21506 · 3.45Budgeted value of the work that, according to the baseline, should have been completed by a given cut-off date.
- Planned valuePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Approved budget for the work that, according to the schedule, should be finished by a given status date.
- Preventive actionISO 21506 · 3.51 und 3.52Action that removes the cause of a possible variance or defect before it occurs.
- Preventive actionPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Step taken ahead of time so that upcoming project work does not drift away from what the project management plan intends.
- Product RegisterPRINCE2 · ManagementproduktePRINCE2 register of all products in a project with their current status, supporting the management of versions and approvals.
- Progress practicePRINCE2 · Praktik FortschrittPRINCE2 7 practice governing how progress is monitored, compared against plans and controlled through tolerances.
- Project forecastcross-frameworkEstimate of when a project is likely to finish and what it will cost in total, based on its current status
- Project management information systemcross-frameworkSoftware-based environment that brings together the plans, resources, costs, documents and reports of one or more projects
- Project management information systemPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Set of tools, such as scheduling, cost tracking, document storage and dashboards, in which a project's management data are brought together.
- S-curvecross-frameworkChart of a project's cumulative costs, labour hours or performance over time, usually shaped like an elongated S
- S-curve analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Analysis of cumulative cost, hours or work over time, which usually follows an S-shaped curve.
- Schedule performance indexISO 21506 · 3.84Ratio of earned value to planned value; values below one indicate that the project is behind plan.
- Schedule performance indexPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Earned value divided by planned value; shows how efficiently the project is progressing compared with its schedule.
- Schedule variancecross-frameworkDifference between the value of the work performed and the value of the work planned; a negative figure means the project is behind plan
- Schedule variancePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Earned value minus planned value; shows in budget units whether the project is ahead of or behind plan.
- Status datecross-frameworkDefined point in time at which the project status is captured and to which the progress, costs and forecasts of a report refer
- Technical performanceISO 21506 · 3.89Measure of which required functions or capabilities a result has already reached while the work is still under way.
- Time-phased budgetISO 21506 · 3.91Budget assigned to the periods or phases in which the work is expected to take place and the costs to arise.
- Tolerance (PRINCE2)PRINCE2 · Praktik FortschrittIn PRINCE2, the permitted deviation above or below a planned target within which a level may decide without referring to the level above.
- TollgateSix SigmaFormal review at the end of each DMAIC phase at which the champion decides whether the Six Sigma project continues, changes course or stops.
- Trend analysiscross-frameworkEvaluation of how project metrics develop over several reporting dates in order to detect future variances early
- Trend analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Evaluation of performance data over several reporting periods that infers future development from the direction and pace of change.
- Undistributed budgetISO 21506 · 3.92Budget released for approved work that for the time being has not yet been allocated to any control account.
- VarianceISO 21506 · 3.93Gap between the approved baseline and what has actually been achieved, for example in schedule, cost or scope.
- VariancePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Quantifiable difference between what the baseline or expectation says should apply and the value actually observed.
- Variance analysiscross-frameworkExamination of the differences between planned and actual project values, their causes and their consequences
- Variance analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Examination of observed deviations from plan: how large they are, where they come from and what they mean for the rest of the project.
- Variance at completionISO 21506 · 3.94Budget at completion minus estimate at completion; shows how far the total cost is expected to depart from the plan.
- Variance at completionPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Expected budget variance at project end: budget at completion minus estimate at completion.
- Variance thresholdISO 21506 · 3.95Limit for variances, set in advance, that determines when the project manager or the sponsor has to step in.
- Work authorizationcross-frameworkExplicit approval to start work on a work package or activity, usually combined with a budget and dates
Concepts in this topic area
- Action against a potential deviationThe action that removes the cause of a possible future deviation or defect before it occurs, so that project performance stays in line with the plan.Preventive action · Preventive action
- Action against an occurred deviationThe action that remedies a deviation that has already occurred, ideally by addressing its cause, and brings project performance back into line with the plan.Corrective action · Corrective action
- Actual cost of work performedThe costs actually incurred for the project work performed up to a data date; in earned value analysis, the value compared with earned value.Actual cost · Actual cost
- Approved reference version of a planThe approved version of scope, schedule or cost against which actual progress is measured; changes to it only through the change control process.Baseline · Baseline
- Body deciding on changesThe formally designated body that reviews change requests and decides on their approval, rejection or deferral before baselines are adjusted.Change control board · Change control board · Change Authority
- Budgeted value of planned workThe budget for the work that the baseline plans to complete by a data date; the reference value for schedule variance and schedule performance index.Planned value · Planned value
- Controlled handling of changesThe process by which changes to the scope, schedule, cost or results of a project are requested, assessed, decided on, implemented and documented.Change control · Change control · Issues practice · Issue Management Approach
- Cost efficiency of work performedThe ratio of earned value to actual cost; a value below one shows that more has been spent than planned for each unit of work actually performed.Cost performance index · Cost performance index
- Cumulative development over the project durationThe curve of cumulative costs, hours or work over time, whose typical S shape makes the comparison of plan and actual over the course of the project clear.S-curve · S-curve analysis
- Decision point between project phasesThe defined point at the end of a project phase at which agreed criteria are used to decide whether the project continues, changes course or is stopped.Gate · Phase gate · Phase Gate · Tollgate · Managing a stage boundary
- Difference between earned value and actual costThe metric that shows whether the work performed up to a data date has cost more or less than planned; a negative value indicates a cost overrun.Cost variance · Cost variance
- Difference between earned value and planned valueThe metric that expresses in budget terms whether a project has completed more or less work than planned by the data date; negative means behind schedule.Schedule variance · Schedule variance
- Difference between plan and actualThe measurable difference between planned and actual value, for example in cost, schedule or performance, as a trigger for analysis and control.Variance · Variance
- Estimate of final dates and costsThe estimate, based on the current status, of when a project is likely to end and what it will cost in total; updated with each new set of data.Project forecast · Forecast
- Evaluating development across several data datesThe analysis of how metrics, dates or costs develop over several reporting points in order to detect changes early and to derive forecasts from them.Trend analysis · Trend analysis
- Examining plan-versus-actual differencesThe examination of how far and why planned and actual values of cost, schedule or performance differ, as the basis for deciding on suitable actions.Variance analysis · Variance analysis
- Expected budget variance at completionThe difference between budget at completion and estimate at completion, which shows how far the project is likely to end over or under budget.Variance at completion · Variance at completion
- Expected cost of the remaining workThe forecast of what the work of a project or a single work package not yet completed is expected to cost from the data date through to completion.Estimate to complete · Estimate to complete
- Expected total cost at completionThe current forecast of the total cost of a piece of work or a project, made up of actual costs and the estimate for the work still outstanding.Estimate at completion · Estimate at completion
- Formal request to change what was agreedThe formal, documented proposal to change the scope, dates, costs or other agreed baselines of a project, which must be reviewed and decided upon.Change request · Change request
- Management unit for scope, budget and scheduleThe point in the project structure at which scope, budget, actual cost and schedule are brought together and performance is measured using earned value.Control account · Control account
- Managing components and versions of a resultThe task of recording the characteristics, components and versions of a result and controlling changes traceably so that it is clear which version applies.Configuration management · Configuration management system · Product Register
- Monitoring and controlling a projectThe ongoing comparison of project status with the plan and the initiation of corrective actions when schedule, cost, scope or quality deviate from it.Control · Progress practice · Monitor & Control · Controlling a stage
- Occurring problem that needs resolutionAn existing question or difficulty in the project that must be dealt with and decided; unlike a risk, it is not uncertain but has already occurred.Issue · Issue
- Performance measurement using earned valueThe technique that compares planned work, work actually performed and actual cost at a data date in order to assess cost and schedule status together.Earned value management · Earned value management
- Permitted margin for deviationsThe predefined limit up to which deviations from plan, upwards or downwards, are accepted without a decision by the level above; beyond it, that level steps in.Variance threshold · Tolerance (PRINCE2)
- Reference date for recorded project statusThe defined point in time at which actual data is recorded and to which progress, variances and forecasts in reports and in the schedule refer.Status date · Data date
- Register of issuesThe continually maintained list of all open issues in a project, recording their description, owner, actions, due date and current resolution status.Issue register · Issue log · Issue Register
- Schedule efficiency of work performedThe ratio of earned value to planned value; a value below one shows that the project is performing work more slowly than the baseline provides for.Schedule performance index · Schedule performance index
- Share of work completedThe share of the planned work of an activity, work package or project that has been completed at a data date, usually expressed as a percentage.Percent complete · Percent complete
- Software environment for project dataThe entire set of software tools with which the plans, resources, costs, documents and reports of a project are recorded, linked and analysed.Project management information system · Project management information system
- Time-phased baseline for performance measurementThe approved, time-phased plan of scope, schedule and budget, excluding management reserve, against which actual performance is measured in earned value.Performance measurement baseline · Performance measurement baseline
- Total budget of the planned workThe sum of all budgets established for the work of a project, work package or control account; reference value for forecasts in earned value.Budget at completion · Budget at completion
- Value of work performedThe value, expressed in budget terms, of the work actually completed up to a data date; the key figure for determining cost and schedule variances.Earned value · Earned value