Value of work performed

Concept · 2 of 9 frameworks name this concept

The value, expressed in budget terms, of the work actually completed up to a data date; the key figure for determining cost and schedule variances.

ConceptValue of work performedTopic area Monitoring and control
Preferred term
ISO 21506 · 3.21Earned valuealso EV · Budgeted cost of work performed · BCWP
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Earned value
Concordance of the concept “Value of work performed”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed