Approaches and agility
Terms for traditional, agile and hybrid approaches and for typical agile working tools such as iterations, user stories and burn-down charts.
- Adaptive approachPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Way of developing a solution when requirements are unclear and likely to shift, so the result takes shape gradually over short cycles.
- Agile Manifestocross-frameworkStatement of principles from 2001 that sets out four values and twelve principles for agile software development
- Agile project managementcross-frameworkApproach that plans and delivers projects in short cycles, adapts requirements continuously and works closely with users
- Burn-down chartcross-frameworkChart showing the remaining work over time, with an ideal line indicating whether a team is likely to reach its goal
- Burndown chartPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Chart plotting how much work is still open against the time remaining in a timebox, so the team can see whether it will finish.
- Design for Six SigmaSix SigmaSix Sigma approach for developing new products, services or processes that are meant to meet customer requirements reliably from the start.
- Design thinkingcross-frameworkUser-centred innovation approach that solves problems through understanding users, ideation, prototyping and testing in repeated loops
- Design thinkingPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Human-centred approach that understands problems from the users’ perspective and develops solutions step by step through prototypes and tests.
- DMAICSix Sigma · ISO 13053-1:2011Five-step approach for Six Sigma improvement projects on existing processes: Define, Measure, Analyze, Improve and Control.
- Epiccross-frameworkLarge requirement in agile backlogs that is too big for one iteration and is therefore broken down into smaller items such as user stories
- EpicPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Sizeable, coherent chunk of work that bundles requirements and is split into smaller items such as user stories.
- Hybrid approachPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Way of working that mixes elements of plan-driven and adaptive approaches within a single undertaking.
- Hybrid project managementcross-frameworkApproach that deliberately combines plan-driven and agile elements, such as a fixed phase framework with agile delivery
- Iterationcross-frameworkRepeated, time-limited work cycle that ends with an intermediate result that can be reviewed
- IterationPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Time-limited development cycle in which all the work for a usable partial result is carried out.
- MethodologyPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Defined combination of steps, roles, techniques and rules that guides how work is done in a particular field.
- Minimum viable productcross-frameworkFirst, deliberately simple version of a product that does just enough to learn from real users whether the idea works
- Minimum viable productPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)First version of a solution with the smallest set of features that delivers real value and allows useful feedback.
- Planning Pokercross-frameworkTeam estimation technique in which members secretly choose cards with effort values and then discuss the differences
- Predictive approachPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Way of developing a result that fixes scope, schedule and cost at an early stage and handles later changes through formal control.
- Process modelcross-frameworkDefined framework that puts the phases, activities, deliverables and roles of a project into a particular order
- Product Backlog itemScrum · Abschnitt Product BacklogSingle element of the Product Backlog that describes a piece of work to improve the product, such as a feature, a fix or an investigation
- Pull principleLeanLean principle under which a step only works or supplies replenishment when the next step or the customer signals a need.
- Pull systemKanban · Abschnitt Actively Managing Items in a WorkflowWay of working in which new work is only started when a clear signal shows free capacity; in Kanban it results from limiting work in progress
- Roadmapcross-frameworkOverview showing which major results, themes or projects are to be tackled in which order over time
- RoadmapPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Overview on a rough time axis showing what is to be achieved or decided roughly when, without planning individual activities.
- SprintScrum · Abschnitt Der SprintFixed-length period of one month or less in which a Scrum Team works towards a Sprint Goal and which contains all other events
- Story pointcross-frameworkRelative unit used by agile teams to estimate the size, effort, complexity and uncertainty of items in comparison with one another
- Story pointPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Unitless measure with which a team estimates the size of user stories relative to one another.
- Tailor to suit the projectPRINCE2 · GrundprinzipienPRINCE2 principle: the method is adapted to the size, risk, context and approach of each project without abandoning the principles.
- TailoringPM² · Abschnitt 3.6 und Anhang GIn PM², adapting the methodology to an organization's environment and needs, for example by changing roles, process steps or artefacts
- TimeboxPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Period of time fixed in advance for a piece of work and never extended; if needed, the scope is adjusted instead.
- Timeboxingcross-frameworkWay of working in which a task or meeting is given a fixed time frame that is not exceeded
- Traditional project managementcross-frameworkPlan-driven approach that fixes a project's objectives, scope and course early and controls delivery against this plan
- User storycross-frameworkShort description of a requirement from the perspective of a user group, naming function and benefit and refined in dialogue with the team
- User storyPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Short statement of a result that brings value to a particular user, meant as an invitation to discuss the details later.
- V-modelcross-frameworkProcess model that sets a matching test level against each design level, forming the shape of a V
- Waterfall modelcross-frameworkProcess model in which the phases of a project are passed through strictly in sequence, each building on the completed previous one
- Work itemKanban · Abschnitt Defining and Visualizing the WorkflowIndividual unit of value that moves through the workflow of a Kanban system, such as an order, a request or a feature
Concepts in this topic area
- Adapting the method to the undertakingAdapting the roles, processes and documents of a project management method to the size, risk and context of an undertaking without abandoning its principles.Tailoring · Tailor to suit the project
- Adaptive approach in short cyclesThe approach that delivers results in short cycles, adapts requirements continually and involves feedback early; suited to high uncertainty.Agile project management · Adaptive approach
- Chart of remaining work over timeThe chart that shows the remaining work over time and compares it with an ideal line, so that the team and stakeholders can read off progress.Burn-down chart · Burndown chart
- Combination of plan-driven and agile approachesThe approach that deliberately combines plan-driven and agile elements, such as a fixed phase framework with iterative development within the phases.Hybrid project management · Hybrid approach
- Defined framework for how a project proceedsThe framework that prescribes the phases, activities, results and roles of a project, such as the waterfall model, the V-model or an agile framework.Process model · Methodology · DMAIC · Design for Six Sigma
- High-level timeline of key resultsThe overview of which key results, themes or releases are planned in which periods, without any detailed planning of individual tasks or activities.Roadmap · Roadmap
- Item in an ordered work listA single element of an ordered list of work that describes a task or requirement and moves through the workflow step by step until it is completed.Product Backlog item · Work item
- Large requirement still to be broken downA large requirement in an agile backlog that is too big for one iteration and is broken down into several smaller items before implementation.Epic · Epic
- Plan-driven approachThe approach that defines the objectives, scope and sequence of a project early and controls implementation against this plan; suited to stable requirements.Traditional project management · Predictive approach
- Relative size unit for agile work itemsThe relative unit with which agile teams estimate the size, complexity and uncertainty of tasks in comparison with each other instead of stating hours.Story point · Story point
- Requirement from the perspective of a user groupThe short description of a desired function and its purpose from a user group’s perspective, with acceptance criteria, as a basis for team conversations.User story · User story
- Simplest product version for learningThe first, deliberately reduced version of a product that does just enough to test assumptions with real users and steer further development.Minimum viable product · Minimum viable product
- Starting work only on demand or when capacity is freeThe control principle under which work is not assigned but pulled by the next step, only in response to a signal of demand or of free capacity.Pull principle · Pull system
- Time-boxed work cycleA repeated, time-boxed work cycle of fixed length that ends with a reviewable result, which in turn feeds into the planning of the next cycle.Iteration · Iteration · Sprint
- User-centred development of solutionsThe innovation approach that solves problems through understanding users, ideation, prototypes and tests in repeated loops, usually in mixed teams.Design thinking · Design thinking
- Working in fixed time framesThe way of working in which a fixed time frame applies to a task, meeting or iteration and is not extended; instead, the content or scope is adapted.Timeboxing · Timebox