Topic area

Approaches and agility

Terms for traditional, agile and hybrid approaches and for typical agile working tools such as iterations, user stories and burn-down charts.

39 terms

Concepts in this topic area

  • Adapting the method to the undertakingAdapting the roles, processes and documents of a project management method to the size, risk and context of an undertaking without abandoning its principles.Tailoring · Tailor to suit the project
  • Adaptive approach in short cyclesThe approach that delivers results in short cycles, adapts requirements continually and involves feedback early; suited to high uncertainty.Agile project management · Adaptive approach
  • Chart of remaining work over timeThe chart that shows the remaining work over time and compares it with an ideal line, so that the team and stakeholders can read off progress.Burn-down chart · Burndown chart
  • Combination of plan-driven and agile approachesThe approach that deliberately combines plan-driven and agile elements, such as a fixed phase framework with iterative development within the phases.Hybrid project management · Hybrid approach
  • Defined framework for how a project proceedsThe framework that prescribes the phases, activities, results and roles of a project, such as the waterfall model, the V-model or an agile framework.Process model · Methodology · DMAIC · Design for Six Sigma
  • High-level timeline of key resultsThe overview of which key results, themes or releases are planned in which periods, without any detailed planning of individual tasks or activities.Roadmap · Roadmap
  • Item in an ordered work listA single element of an ordered list of work that describes a task or requirement and moves through the workflow step by step until it is completed.Product Backlog item · Work item
  • Large requirement still to be broken downA large requirement in an agile backlog that is too big for one iteration and is broken down into several smaller items before implementation.Epic · Epic
  • Plan-driven approachThe approach that defines the objectives, scope and sequence of a project early and controls implementation against this plan; suited to stable requirements.Traditional project management · Predictive approach
  • Relative size unit for agile work itemsThe relative unit with which agile teams estimate the size, complexity and uncertainty of tasks in comparison with each other instead of stating hours.Story point · Story point
  • Requirement from the perspective of a user groupThe short description of a desired function and its purpose from a user group’s perspective, with acceptance criteria, as a basis for team conversations.User story · User story
  • Simplest product version for learningThe first, deliberately reduced version of a product that does just enough to test assumptions with real users and steer further development.Minimum viable product · Minimum viable product
  • Starting work only on demand or when capacity is freeThe control principle under which work is not assigned but pulled by the next step, only in response to a signal of demand or of free capacity.Pull principle · Pull system
  • Time-boxed work cycleA repeated, time-boxed work cycle of fixed length that ends with a reviewable result, which in turn feeds into the planning of the next cycle.Iteration · Iteration · Sprint
  • User-centred development of solutionsThe innovation approach that solves problems through understanding users, ideation, prototypes and tests in repeated loops, usually in mixed teams.Design thinking · Design thinking
  • Working in fixed time framesThe way of working in which a fixed time frame applies to a task, meeting or iteration and is not extended; instead, the content or scope is adapted.Timeboxing · Timebox

All concepts compared