Permitted margin for deviations
The predefined limit up to which deviations from plan, upwards or downwards, are accepted without a decision by the level above; beyond it, that level steps in.
Preferred term
ISO 21506 · 3.95Variance threshold
equivalent
PRINCE2 · Praktik FortschrittTolerance (PRINCE2)
All frameworks at a glance
2 designations · 7 not yet reviewed
- ISO 21506Variance thresholdPreferred term · 3.95
- PRINCE2Tolerance (PRINCE2)equivalent