Body deciding on changes

Concept · 3 of 10 frameworks name this concept

The formally designated body that reviews change requests and decides on their approval, rejection or deferral before baselines are adjusted.

ConceptBody deciding on changesTopic area Monitoring and control
Preferred term
cross-frameworkChange control boardalso CCB · Change board
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Change control board
closely related
PRINCE2 · Praktik OrganisationChange AuthorityCan also be a single person; authority derived from and limited by the Project Board.
Concordance of the concept “Body deciding on changes”. The preferred term is the designation under which the glossary lists the concept.