Expected cost of the remaining work

Concept · 2 of 9 frameworks name this concept

The forecast of what the work of a project or a single work package not yet completed is expected to cost from the data date through to completion.

ConceptExpected cost of the remaining workTopic area Monitoring and control
Preferred term
ISO 21506 · 3.26Estimate to completealso ETC
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Estimate to complete
Concordance of the concept “Expected cost of the remaining work”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • ISO 21506
    Estimate to completePreferred term · 3.26
  • PMI / PMBOK
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed