Topic area
Scope and requirements
Terms for what a project is to deliver: requirements, deliverables, statement of work, acceptance criteria and protection against scope creep.
- Acceptance criteriacross-frameworkTestable conditions agreed in advance that a deliverable must meet in order to be accepted
- Acceptance criteriaPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Checkable standards, agreed in advance, that decide at acceptance whether a deliverable can be taken over.
- Critical to QualitySix Sigma · ISO 13053-2:2011Measurable characteristic of a product or process that is decisive for quality from the customer’s point of view, with target value and limits.
- Customer requirements specificationcross-frameworkDescription prepared by the client of all requirements for a result: what is to be delivered and for what purpose
- Definition of DoneScrum · Abschnitt Commitment: Definition of DoneBinding description of the quality a result must reach to count as an Increment; the commitment belonging to the Increment
- DeliverableISO 21506 · 3.20Verifiable result that is produced in a project and handed over to the client, users or subsequent work.
- DeliverablePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Verifiable result, such as a product, a document or a capability, without which the process, phase or project concerned cannot be closed.
- Deliverables Acceptance Management PlanPM² · Abschnitt 6.6PM² plan that sets out criteria, steps, responsibilities and schedule for the formal acceptance of the deliverables
- Functional specificationcross-frameworkDescription prepared by the contractor of how, and with what, the requirements of the customer requirements specification are to be met
- IncrementScrum · Abschnitt IncrementConcrete, usable step towards the Product Goal that adds to all previous results and meets the criteria of the Definition of Done
- MoSCoW methodcross-frameworkPrioritization technique that divides requirements into must have, should have, could have and won't have this time
- Project Product DescriptionPRINCE2 · ManagementprodukteSpecial form of the PRINCE2 product description for the project’s overall output, with quality expectations and acceptance criteria.
- Project scopeISO 21506 · 3.69The work released for a project together with its results, delimited from everything that is explicitly excluded.
- Project scopePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)All the work a project has to do to deliver its result, as distinct from the features of the result itself; recorded in scope statement and WBS.
- Requirementcross-frameworkDocumented condition or capability that a project result must meet in order to satisfy a stakeholder need
- RequirementPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Property or ability a result must have to meet a business need; gathered from stakeholders and traced through to acceptance.
- Scope creepcross-frameworkGradual, unapproved expansion of project scope through many small additional requests without adjusting time and budget
- Scope creepPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Gradual, uncontrolled growth of scope through additions that bypass change control, while schedule, budget and resources stay as they were.
- Statement of workcross-frameworkDocument describing the nature, scope and quality of a service or delivery so that it can be tendered, delivered and verified
- Statement of workPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Written account of what a project or contractor is to deliver, especially as the basis for a tender and contract.
- Voice of the CustomerSix Sigma · ISO 13053-2:2011Systematically gathered needs, expectations and complaints of a process’s customers, in their own words, as the starting point for measurable requirements.
Concepts in this topic area
- Condition a result must meetA described characteristic or capability that a project result must have in order to satisfy a contract, a standard or the needs of its users.Requirement · Requirement · Voice of the Customer · Critical to Quality
- Criteria for a finished resultThe verifiable conditions agreed in advance that a result or deliverable must meet in order to be considered finished and to be formally accepted.Acceptance criteria · Acceptance criteria · Deliverables Acceptance Management Plan · Definition of Done
- Description of work to be performedThe document that describes the nature, scope and quality of work in such a way that it can be offered, awarded, performed, verified and accepted.Statement of work · Statement of work
- Gradual uncontrolled expansion of scopeThe uncontrolled expansion of project scope through many small, unapproved additions without adjusting the schedule, cost or resources accordingly.Scope creep · Scope creep
- Totality of results and work to be deliveredAll results and work that a project is to deliver, including a statement of what is expressly excluded; the basis for planning and for changes.Project scope · Project scope · Project Product Description
- Verifiable project resultA clearly delimited and verifiable result that is produced in a project and then handed over to the sponsor, to the users or to subsequent work.Deliverable · Deliverable · Increment