Difference between earned value and actual cost

Concept · 2 of 9 frameworks name this concept

The metric that shows whether the work performed up to a data date has cost more or less than planned; a negative value indicates a cost overrun.

ConceptDifference between earned value and actual costTopic area Monitoring and control
Preferred term
ISO 21506 · 3.17Cost variancealso CV
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Cost variance
Concordance of the concept “Difference between earned value and actual cost”. The preferred term is the designation under which the glossary lists the concept.