Cumulative development over the project duration

Concept · 2 of 10 frameworks name this concept

The curve of cumulative costs, hours or work over time, whose typical S shape makes the comparison of plan and actual over the course of the project clear.

ConceptCumulative development over the project durationTopic area Monitoring and control
Preferred term
cross-frameworkS-curve
closely related
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)S-curve analysisdenotes the analysis based on the curve, not the curve itself
Concordance of the concept “Cumulative development over the project duration”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
    S-curve analysisclosely related
  • general
    S-curvePreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed