Actual cost of work performed

Concept · 2 of 9 frameworks name this concept

The costs actually incurred for the project work performed up to a data date; in earned value analysis, the value compared with earned value.

ConceptActual cost of work performedTopic area Monitoring and control
Preferred term
ISO 21506 · 3.3Actual costalso AC · Actual cost of work performed · ACWP
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Actual cost
Concordance of the concept “Actual cost of work performed”. The preferred term is the designation under which the glossary lists the concept.