Network planning

Terms of network planning: network diagram types, logical relationships, earliest and latest dates, float and the critical path as the basis for dates.

54 terms

Concepts in this topic area

  • Activity on which another dependsThe activity that immediately precedes another in the sequence and is linked to it by a logical relationship; its dates affect the successor.Predecessor activity · Predecessor activity
  • Activity that depends on anotherThe activity that immediately follows another in the sequence and depends on its start or finish through a logical relationship in the schedule.Successor activity · Successor activity
  • Activity without scheduling flexibilityAn activity on the critical path that has no float or scheduling flexibility, so that any delay to it immediately moves the end date of the whole project.Critical activity · Critical path activity
  • Brought-forward start relative to the predecessorThe time by which a successor may start before its predecessor finishes; in the network diagram, a negative time interval between two activities.Lead · Lead
  • Calculation method for dates and floatThe network planning method that calculates earliest and latest dates, float and the critical path from activity durations and dependencies.Critical path method · Critical path method
  • Calculation of earliest datesThe network planning calculation step that determines the earliest start and finish dates of all activities from the project start along the dependencies.Forward pass · Forward pass
  • Calculation of latest datesThe network planning calculation step that determines the latest allowable finish and start dates from the project end against the dependencies.Backward pass · Backward pass
  • Diagram of activities and their dependenciesThe representation of the activities of a project as a network of nodes and arrows that shows the order in which pieces of work depend on each other.Network schedule · Project schedule network diagram
  • Earliest possible finish of an activityThe earliest point in time at which an activity can be completed if it starts at its earliest start date; calculated in the forward pass through the network.Early finish date · Early finish date
  • Earliest possible start of an activityThe earliest point in time at which an activity can start if all predecessors finish on schedule; result of the forward pass in the network diagram.Early start date · Early start date
  • Finish after another activity finishesThe logical relationship in which an activity can finish only once another has finished, such as acceptance tests only after documentation is complete.Finish-to-finish relationship · Finish-to-finish
  • Finish after another activity startsThe rarely used logical relationship in which an activity can finish only once another has started, such as legacy operation until the new system goes live.Start-to-finish relationship · Start-to-finish
  • Latest allowable finish of an activityThe latest point in time by which an activity must be finished so that neither successors nor the project end are delayed; result of the backward pass.Late finish date · Late finish date
  • Latest allowable start of an activityThe latest point in time at which an activity may start without jeopardizing the planned project end; result of the backward pass in the network diagram.Late start date · Late start date
  • Longest sequence of activities without floatThe chain of activities in the network diagram that has no scheduling flexibility and therefore determines the earliest possible end of a project or phase.Critical path · Critical path
  • Network diagram with activities on nodesThe widely used form of network diagram in which each activity is a node and arrows represent the logical relationships between the activities.Activity-on-node network · Precedence diagramming method
  • Schedule estimation with three values per activityThe network planning technique that sets an optimistic, a most likely and a pessimistic duration for each activity and derives schedule probabilities from them.PERT · Program evaluation and review technique
  • Scheduling dependency between two activitiesThe defined link between two activities that determines when one may start or finish relative to the other; four basic types are distinguished.Logical relationship · Logical relationship
  • Scheduling flexibility relative to project completionThe time by which an activity can be delayed from its early start or extended without delaying the end of the project or breaching a fixed finish date.Total float · Total float
  • Scheduling flexibility relative to successorsThe amount of time by which an activity can be delayed without pushing back the earliest start of any of its immediate successors in the schedule.Free float · Free float
  • Scheduling with aggregated buffersThe planning method that takes resource constraints into account and moves safety time from individual activities into shared buffers at the end of the chain.Critical chain method · Critical chain method
  • Start after another activity startsThe logical relationship in which an activity can start at the earliest once another has started; typical of coupled work running in parallel.Start-to-start relationship · Start-to-start
  • Start after the predecessor finishesThe most common logical relationship: an activity can start only when its predecessor has finished, such as painting only after the plastering is complete.Finish-to-start relationship · Finish-to-start
  • Waiting time between predecessor and successorThe time that must elapse between the finish of an activity and the start of its successor, such as drying times; in the network diagram, a positive interval.Lag · Lag

All concepts compared