Topic area
Risks and opportunities
Terms of risk management: identifying, assessing and responding to risks and opportunities, building reserves and quantifying overall uncertainty.
- Contingency plancross-frameworkResponse planned in advance and triggered when a known risk occurs, in order to limit its consequences
- Contingency planPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Set of responses agreed beforehand that the team puts into action as soon as defined trigger conditions arise.
- Contingency reservePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Buffer of time or money for risks already identified, deliberately built into the baseline and at the project manager’s disposal.
- Decision tree analysiscross-frameworkMethod that represents decisions under uncertainty as a branching tree and compares the alternatives by their expected value
- Decision tree analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Graphical calculation method that lays out decision alternatives and their uncertain consequences as branches and evaluates them.
- Expected monetary valuecross-frameworkFigure that multiplies the probability and financial impact of an uncertain event to make risks comparable
- Expected monetary valuePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Statistical average of an uncertain outcome: the sum of possible impacts, each weighted by its probability.
- Influence diagramcross-frameworkGraphical representation that shows decisions, uncertain variables and objectives as nodes and links their relationships with arrows
- Management reserveISO 21506 · 3.36Portion of the budget held back for unforeseeable work within the agreed scope, released by management and not part of the measurement baseline.
- Management reservePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Portion of the project budget or schedule time held back for work that nobody foresaw but that lies within the project scope.
- Monte Carlo simulationcross-frameworkComputational method that runs a project model thousands of times with randomly drawn values to determine probabilities for dates and costs
- OpportunityISO 21506 · 3.39Uncertain event or circumstance that, if it occurs, would have a positive effect on a project's objectives.
- OpportunityPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk with a welcome effect, such as lower costs or earlier completion, that can be deliberately exploited or enhanced.
- Probability and impact matrixPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Grid that ranks risks by combining how likely each one is with how strongly it would affect the objectives.
- Qualitative risk analysiscross-frameworkAssessment of identified risks by probability and impact on graded scales in order to prioritize them
- Qualitative risk analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Prioritizing individual project risks by assessing probability, impact and other characteristics.
- Quantitative risk analysiscross-frameworkNumerical assessment of project risks to determine their combined effect on cost, schedule and the probability of success
- Quantitative risk analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Numerical assessment of how individual risks and other uncertainties together are likely to affect the project's objectives.
- Residual riskISO 21506 · 3.72Risk that remains once the agreed response actions have been carried out, assessed by likelihood and impact.
- Residual riskPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)The portion of risk that planned responses do not remove and that is knowingly accepted, recorded and kept under watch.
- RiskISO 21506 · 3.76Possible event that is still uncertain, possibly made up of several events, and that could benefit or harm an undertaking.
- RiskPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Umbrella term for threats and opportunities: something that may or may not happen and, if it does, affects at least one objective.
- Risk acceptancecross-frameworkDeliberate decision to bear a risk without preventive measures and to accept its consequences should it occur
- Risk acceptancePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Response strategy of consciously tolerating a risk and taking no advance measures against or in favor of its occurrence.
- Risk analysiscross-frameworkExamination of identified risks by cause, probability and impact as a basis for priorities and responses
- Risk analysisPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Examination of identified risks by probability, impact and other characteristics in order to prioritize them and prepare responses.
- Risk appetitecross-frameworkAmount of risk that an organization or sponsor is willing to take on in order to achieve its objectives
- Risk appetitePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)How much uncertainty an organization or person is willing to bear for the sake of a hoped-for gain; made measurable through risk thresholds.
- Risk assuranceISO 21506 · 3.77Review activities intended to give sponsors reliable evidence that a project or programme can still justify its investment despite its risks.
- Risk avoidancecross-frameworkStrategy that eliminates a risk by removing its cause or changing the undertaking so that the risk cannot arise
- Risk avoidancePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Strategy against a threat that removes it altogether or shields the project completely from its effects.
- Risk breakdown structureISO 21506 · 3.78Hierarchical breakdown of the threats and opportunities of a project or programme, usually arranged by source of risk.
- Risk breakdown structurePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Layered classification of conceivable risk sources, e.g. technical, organizational, commercial and external, used as a grid for identifying risks.
- Risk categorycross-frameworkGroup of similar risks, such as technical, organizational, commercial or external, that makes searching and evaluation easier
- Risk categoryPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Group for sorting risks with related causes, for example taken from the risk breakdown structure, so that clusters show and responses can be combined.
- Risk contingency reserveISO 21506 · 3.79Time or budget allowance planned for identified risks, to be used only if they materialize.
- Risk identificationcross-frameworkStep in risk management in which the possible risks of a project are sought out, described and recorded
- Risk identificationPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Recognizing and describing individual project risks and the sources of overall project uncertainty.
- Risk managementcross-frameworkSystematic handling of uncertainty in a project: identifying, assessing, responding to and continuously monitoring risks
- Risk managementPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Systematic handling of project risks: planning, identifying, analysing, deciding and implementing responses, monitoring.
- Risk Management ApproachPRINCE2 · Praktik RisikoPRINCE2 management product defining how risks in the project are identified, assessed, controlled and reported.
- Risk management plancross-frameworkDocument that defines how risk management is organized and carried out in a project
- Risk management planPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Subsidiary plan setting the methods, roles, budget, rating scales and reporting for risk work on the project, not the risks themselves.
- Risk matrixcross-frameworkGrid that places risks by probability and impact and divides them by colour into low, medium and high risks
- Risk mitigationcross-frameworkStrategy that reduces the probability or the impact of a risk to an acceptable level
- Risk mitigationPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Strategy against threats that acts early to make their occurrence less likely or their consequences milder, for instance through tests or prototypes.
- Risk practicePRINCE2 · Praktik RisikoPRINCE2 7 practice for identifying, assessing and controlling uncertainties that threaten or favour the project’s objectives.
- Risk registercross-frameworkCentral list of all identified risks of a project with their assessment, owners, responses and current status
- Risk registerPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Record in which the findings of risk management on individual risks are captured and continually updated.
- Risk RegisterPRINCE2 · Praktik RisikoPRINCE2 management product that records all identified threats and opportunities of a project with assessment, responses, owners and status.
- Risk responseISO 21506 · 3.80Defined and documented action taken in relation to an identified risk, ranging from prevention to recovery after the event.
- Risk responsePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)The strategy and actions chosen by a project to respond to an individual risk or to overall project risk.
- Risk thresholdPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Measurable level of risk exposure above which a risk is addressed and below which it may be accepted.
- Risk toleranceISO 21506 · 3.81Limit up to which a project may carry a risk; once the limit is crossed, a defined response has to follow.
- Risk transfercross-frameworkStrategy that shifts the consequences of a risk wholly or partly to a third party, such as an insurer or a contractual partner
- Risk transferencePMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Strategy that hands a threat, together with responsibility for its consequences, to another party outside the project.
- Secondary riskcross-frameworkNew risk that arises only as a result of implementing a response to another risk
- Secondary riskPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Follow-on risk that arises only because a risk response is carried out and must be assessed and handled like any other risk.
- Sensitivity analysiscross-frameworkExamination of how strongly the outcome of a project changes when individual input variables are changed
- ThreatISO 21506 · 3.90Possible event that, if it occurs, would impair schedule, cost, quality or other project objectives.
- ThreatPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk with an adverse effect that would endanger schedule, cost, scope or quality and is handled with strategies such as avoidance or mitigation.
- Workaroundcross-frameworkUnplanned, usually makeshift solution with which a project reacts to a problem that has occurred and for which nothing was prepared
- WorkaroundPMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Unplanned, short-term fix for a problem that no response was prepared for or for which the prepared response has failed.
Concepts in this topic area
- Acceptable level of riskThe degree of uncertainty that an organization or sponsor is willing to accept for the expected benefit; the yardstick for thresholds and responses.Risk appetite · Risk appetite
- Allowance for known risksThe time or budget buffer for identified risks that is used only if they occur; to be distinguished from the management reserve for the unforeseen.Risk contingency reserve · Contingency reserve
- Arrangements for risk management in a projectThe document that describes how risks are identified, assessed, treated and reported in the project, including roles, scales, thresholds and timing.Risk management plan · Risk management plan · Risk Management Approach
- Central list of project risksThe register of all identified risks of a project with assessment, owners, responses and status, which is continually updated throughout the project.Risk register · Risk register · Risk Register
- Consciously accepting a riskThe deliberate decision to forgo preventive measures and bear the consequences of a risk if it occurs, often backed by a reserve for that case.Risk acceptance · Risk acceptance
- Eliminating a riskThe response strategy of eliminating a risk entirely by removing its cause or changing the plan so that the threatening event can no longer occur.Risk avoidance · Risk avoidance
- Evaluating decisions under uncertainty as a treeThe technique that shows decisions, chance events and their consequences as a branching tree and finds the best alternative using expected monetary value.Decision tree analysis · Decision tree analysis
- Examination of identified risksThe examination of identified risks by their causes, probability and impact as the basis for setting priorities and choosing suitable responses.Risk analysis · Risk analysis
- Grid of probability and impactThe matrix that places risks in cells by probability and impact and uses colour to show which require immediate action and which only need monitoring.Risk matrix · Probability and impact matrix
- Group of similar risksThe classification of risks by source or type, such as technical, organizational or contractual, which facilitates identification, analysis and assignment.Risk category · Risk category
- Hierarchical breakdown of risk sourcesThe tree-like structure of possible risk sources in a project, which serves as a search grid for risk identification and for analysis by category.Risk breakdown structure · Risk breakdown structure
- Identifying potential risksThe risk management step in which possible risks and opportunities are sought, described and recorded in the risk register, e.g. using checklists or workshops.Risk identification · Risk identification
- Numerical assessment of overall riskThe numerical analysis of how risks jointly affect cost and schedule, for example using simulation or decision trees, in order to justify reserves.Quantitative risk analysis · Quantitative risk analysis
- Pre-planned response to an occurring riskThe response defined in advance that is triggered as soon as a known risk occurs, so that the project can react without lengthy coordination.Contingency plan · Contingency plan
- Probability-weighted financial effectThe metric obtained by multiplying the probability by the financial impact of an uncertain event, which makes risks and decision alternatives comparable.Expected monetary value · Expected monetary value
- Rating risks by probability and impactThe assessment of identified risks using levels rather than figures in order to rank them by probability and impact and address the most important first.Qualitative risk analysis · Qualitative risk analysis
- Reducing probability or impactThe strategy of lowering either the probability of occurrence or the impact of a risk to an acceptable level by taking preventive measures in good time.Risk mitigation · Risk mitigation
- Reserve for unforeseen workThe part of the budget withheld for unforeseeable work within the agreed project scope, which is not part of the performance measurement baseline.Management reserve · Management reserve
- Risk arising from a responseA new risk that arises only as a result of implementing a response to another risk, for example dependence on an insurer or on a subcontractor.Secondary risk · Secondary risk
- Risk in a projectAn uncertain event or condition that, if it occurs, has a positive or negative effect on at least one project objective; covers both threats and opportunities.Risk · Risk
- Risk remaining after responsesThe risk that remains after the planned responses have been implemented and must be consciously accepted, monitored further or covered by reserves.Residual risk · Residual risk
- Risk with a negative effect on project objectivesAn uncertain event that, if it occurs, impairs schedule, cost, quality or other project objectives; this is the negative side of the broader risk concept.Threat · Threat
- Risk with a positive effect on project objectivesAn uncertain event or condition that, if it occurs, benefits project objectives, such as lower prices; the positive side of the risk concept.Opportunity · Opportunity
- Selecting and implementing risk responsesThe step in which strategies such as avoid, transfer, mitigate or accept are chosen for assessed risks, owners are named and responses are implemented.Risk response · Risk response
- Shifting the consequences of a risk to a third partyThe strategy of passing the consequences of a risk wholly or partly to others, such as through insurance or contract clauses; the risk itself remains.Risk transfer · Risk transference
- Systematic handling of uncertainty in a projectThe ongoing process of identifying and assessing risks and opportunities, defining responses and monitoring their effect so that objectives remain achievable.Risk management · Risk management · Risk practice
- Threshold at which a risk triggers actionThe defined level of variance or risk above which a defined response is triggered; it is derived from the risk appetite of the organization.Risk tolerance · Risk threshold
- Unplanned makeshift solution to an occurring problemThe short-term, unplanned response to a risk or problem that has occurred, which keeps operations running until a permanent solution is in place.Workaround · Workaround