Approved reference version of a plan
Concept · 2 of 9 frameworks name this concept
The approved version of scope, schedule or cost against which actual progress is measured; changes to it only through the change control process.
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Baseline Concordance of the concept “Approved reference version of a plan”. The preferred term is the designation under which the glossary lists the concept.All frameworks at a glance