Examining plan-versus-actual differences

Concept · 2 of 10 frameworks name this concept

The examination of how far and why planned and actual values of cost, schedule or performance differ, as the basis for deciding on suitable actions.

ConceptExamining plan-versus-actual differencesTopic area Monitoring and control
Preferred term
cross-frameworkVariance analysis
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Variance analysis
Concordance of the concept “Examining plan-versus-actual differences”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
  • general
    Variance analysisPreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed