Identifying potential risks

Concept · 2 of 10 frameworks name this concept

The risk management step in which possible risks and opportunities are sought, described and recorded in the risk register, e.g. using checklists or workshops.

ConceptIdentifying potential risksTopic area Risks and opportunities
Preferred term
cross-frameworkRisk identification
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk identification
Concordance of the concept “Identifying potential risks”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
  • general
    Risk identificationPreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed