Reserve for unforeseen work

Concept · 2 of 9 frameworks name this concept

The part of the budget withheld for unforeseeable work within the agreed project scope, which is not part of the performance measurement baseline.

ConceptReserve for unforeseen workTopic area Risks and opportunities
Preferred term
ISO 21506 · 3.36Management reservealso MR
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Management reserve
Concordance of the concept “Reserve for unforeseen work”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 5 not yet reviewed
  • ISO 21506
    Management reservePreferred term · 3.36
  • PMI / PMBOK
  • Scrum
    no designation
  • Kanban
    no designation
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed