Reducing probability or impact
The strategy of lowering either the probability of occurrence or the impact of a risk to an acceptable level by taking preventive measures in good time.
Preferred term
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk mitigation
All frameworks at a glance
2 designations · 2 without counterpart · 6 not yet reviewed
- PMI / PMBOKRisk mitigationequivalent
- generalRisk mitigationPreferred term
- Scrumno designation
- Kanbanno designation
- ISO 21506not yet reviewed
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed