Pre-planned response to an occurring risk

Concept · 2 of 10 frameworks name this concept

The response defined in advance that is triggered as soon as a known risk occurs, so that the project can react without lengthy coordination.

ConceptPre-planned response to an occurring riskTopic area Risks and opportunities
Preferred term
cross-frameworkContingency planalso Contingent response
closely related
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Contingency plandenotes the plan with its triggers, the contingency response the reaction itself
Concordance of the concept “Pre-planned response to an occurring risk”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
    Contingency planclosely related
  • general
    Contingency planPreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed