Home Glossary Concordance Risk in a project Risk in a project Concept · 2 of 9 frameworks name this concept
An uncertain event or condition that, if it occurs, has a positive or negative effect on at least one project objective; covers both threats and opportunities.
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024) Risk Concordance of the concept “Risk in a project”. The preferred term is the designation under which the glossary lists the concept. All frameworks at a glance 2 designations · 2 without counterpart · 5 not yet reviewed Framework full overlap partial none
ISO 21506 Risk Preferred term · 3.76 PMI / PMBOK Scrum Kanban PRINCE2 IPMA PM² Lean Six Sigma