Risk with a negative effect on project objectives

Concept · 2 of 9 frameworks name this concept

An uncertain event that, if it occurs, impairs schedule, cost, quality or other project objectives; this is the negative side of the broader risk concept.

ConceptRisk with a negative effect on project objectivesTopic area Risks and opportunities
Preferred term
ISO 21506 · 3.90Threat
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Threat
Concordance of the concept “Risk with a negative effect on project objectives”. The preferred term is the designation under which the glossary lists the concept.