Hierarchical breakdown of risk sources
The tree-like structure of possible risk sources in a project, which serves as a search grid for risk identification and for analysis by category.
Preferred term
ISO 21506 · 3.78Risk breakdown structure
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk breakdown structure
All frameworks at a glance
2 designations · 2 without counterpart · 5 not yet reviewed
- ISO 21506Risk breakdown structurePreferred term · 3.78
- PMI / PMBOKRisk breakdown structureequivalent
- Scrumno designation
- Kanbanno designation
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed