Eliminating a risk

Concept · 2 of 10 frameworks name this concept

The response strategy of eliminating a risk entirely by removing its cause or changing the plan so that the threatening event can no longer occur.

ConceptEliminating a riskTopic area Risks and opportunities
Preferred term
cross-frameworkRisk avoidance
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk avoidance
Concordance of the concept “Eliminating a risk”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
    Risk avoidanceequivalent
  • general
    Risk avoidancePreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed