Acceptable level of risk

Concept · 2 of 10 frameworks name this concept

The degree of uncertainty that an organization or sponsor is willing to accept for the expected benefit; the yardstick for thresholds and responses.

ConceptAcceptable level of riskTopic area Risks and opportunities
Preferred term
cross-frameworkRisk appetite
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Risk appetite
Concordance of the concept “Acceptable level of risk”. The preferred term is the designation under which the glossary lists the concept.