Risk with a positive effect on project objectives

Concept · 2 of 9 frameworks name this concept

An uncertain event or condition that, if it occurs, benefits project objectives, such as lower prices; the positive side of the risk concept.

ConceptRisk with a positive effect on project objectivesTopic area Risks and opportunities
Preferred term
ISO 21506 · 3.39Opportunity
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Opportunity
Concordance of the concept “Risk with a positive effect on project objectives”. The preferred term is the designation under which the glossary lists the concept.