Risk arising from a response

Concept · 2 of 10 frameworks name this concept

A new risk that arises only as a result of implementing a response to another risk, for example dependence on an insurer or on a subcontractor.

ConceptRisk arising from a responseTopic area Risks and opportunities
Preferred term
cross-frameworkSecondary risk
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Secondary risk
Concordance of the concept “Risk arising from a response”. The preferred term is the designation under which the glossary lists the concept.