Longest sequence of activities without float

Concept · 2 of 9 frameworks name this concept

The chain of activities in the network diagram that has no scheduling flexibility and therefore determines the earliest possible end of a project or phase.

ConceptLongest sequence of activities without floatTopic area Network planning
Preferred term
ISO 21506 · 3.18Critical path
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Critical path
Concordance of the concept “Longest sequence of activities without float”. The preferred term is the designation under which the glossary lists the concept.