Calculation method for dates and float

Concept · 2 of 10 frameworks name this concept

The network planning method that calculates earliest and latest dates, float and the critical path from activity durations and dependencies.

ConceptCalculation method for dates and floatTopic area Network planning
Preferred term
cross-frameworkCritical path methodalso CPM
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Critical path method
Concordance of the concept “Calculation method for dates and float”. The preferred term is the designation under which the glossary lists the concept.