Calculation method for dates and float
The network planning method that calculates earliest and latest dates, float and the critical path from activity durations and dependencies.
Preferred term
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Critical path method
All frameworks at a glance
2 designations · 2 without counterpart · 6 not yet reviewed
- PMI / PMBOKCritical path methodequivalent
- generalCritical path methodPreferred term
- Scrumno designation
- Kanbanno designation
- ISO 21506not yet reviewed
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed