Network diagram with activities on nodes

Concept · 2 of 10 frameworks name this concept

The widely used form of network diagram in which each activity is a node and arrows represent the logical relationships between the activities.

ConceptNetwork diagram with activities on nodesTopic area Network planning
Preferred term
cross-frameworkActivity-on-node networkalso AON · PDM
closely related
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Precedence diagramming methodnames the diagramming method, the activity-on-node network diagram its result
Concordance of the concept “Network diagram with activities on nodes”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
  • general
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed