Scheduling flexibility relative to project completion

Concept · 2 of 10 frameworks name this concept

The time by which an activity can be delayed from its early start or extended without delaying the end of the project or breaching a fixed finish date.

ConceptScheduling flexibility relative to project completionTopic area Network planning
Preferred term
cross-frameworkTotal floatalso TF · Total slack
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Total float
Concordance of the concept “Scheduling flexibility relative to project completion”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
    Total floatequivalent
  • general
    Total floatPreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed