Waiting time between predecessor and successor

Concept · 2 of 10 frameworks name this concept

The time that must elapse between the finish of an activity and the start of its successor, such as drying times; in the network diagram, a positive interval.

ConceptWaiting time between predecessor and successorTopic area Network planning
Preferred term
cross-frameworkLagalso Lag time
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Lag
Concordance of the concept “Waiting time between predecessor and successor”. The preferred term is the designation under which the glossary lists the concept.