Latest allowable start of an activity

Concept · 2 of 10 frameworks name this concept

The latest point in time at which an activity may start without jeopardizing the planned project end; result of the backward pass in the network diagram.

ConceptLatest allowable start of an activityTopic area Network planning
Preferred term
cross-frameworkLate start datealso Late start · LS
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Late start date
Concordance of the concept “Latest allowable start of an activity”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
    Late start dateequivalent
  • general
    Late start datePreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed