Adapting the method to the undertaking

Concept · 2 of 9 frameworks name this concept

Adapting the roles, processes and documents of a project management method to the size, risk and context of an undertaking without abandoning its principles.

ConceptAdapting the method to the undertakingTopic area Approaches and agility
Preferred term
PM² · Abschnitt 3.6 und Anhang GTailoring
closely related
PRINCE2 · GrundprinzipienTailor to suit the projectIn PRINCE2 a mandatory principle; the seven principles themselves may not be dropped.
Concordance of the concept “Adapting the method to the undertaking”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 7 not yet reviewed
  • PRINCE2
  • PM²
    TailoringPreferred term · Abschnitt 3.6 und Anhang G
  • ISO 21506
    not yet reviewed
  • PMI / PMBOK
    not yet reviewed
  • IPMA
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed