Requirement from the perspective of a user group
The short description of a desired function and its purpose from a user group’s perspective, with acceptance criteria, as a basis for team conversations.
Preferred term
cross-frameworkUser story
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)User story
All frameworks at a glance
2 designations · 8 not yet reviewed
- PMI / PMBOKUser storyequivalent
- generalUser storyPreferred term
- ISO 21506not yet reviewed
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Scrumnot yet reviewed
- Kanbannot yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed