Time-boxed work cycle
A repeated, time-boxed work cycle of fixed length that ends with a reviewable result, which in turn feeds into the planning of the next cycle.
Preferred term
cross-frameworkIteration
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Iteration
closely related
Scrum · Abschnitt Der SprintSprintone month at most, with a Sprint Goal and fixed events; contains all the work up to the Increment