Verifiable project result
A clearly delimited and verifiable result that is produced in a project and then handed over to the sponsor, to the users or to subsequent work.
Preferred term
ISO 21506 · 3.20Deliverable
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Deliverable
partially overlapping
Scrum · Abschnitt IncrementIncrementusable step towards the Product Goal that includes all previous Increments; not every deliverable is an Increment
All frameworks at a glance
3 designations · 6 not yet reviewed
- ISO 21506DeliverablePreferred term · 3.20
- PMI / PMBOKDeliverableequivalent
- ScrumIncrementpartially overlapping
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Kanbannot yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed