Description of work to be performed

Concept · 2 of 10 frameworks name this concept

The document that describes the nature, scope and quality of work in such a way that it can be offered, awarded, performed, verified and accepted.

ConceptDescription of work to be performedTopic area Scope and requirements
Preferred term
cross-frameworkStatement of workalso SOW
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Statement of work
Concordance of the concept “Description of work to be performed”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 8 not yet reviewed
  • PMI / PMBOK
  • general
    Statement of workPreferred term
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Scrum
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed