Six Sigma is a data-driven approach to process improvement. It reduces variation and defects and usually runs improvement projects along the DMAIC cycle.

Independent presentation. The original text is authoritative in each case.

Six Sigma: learn and test terms

Frequently asked questions

Where does Six Sigma come from?

Six Sigma was developed at Motorola in the 1980s to reduce defect rates in manufacturing in a measurable way. The approach became widely known in the 1990s through General Electric. Today it is used in manufacturing, services and administration.

What does the name Six Sigma mean?

In statistics, sigma denotes the standard deviation. A process at Six Sigma level lies so far within its tolerance limits that, by the usual convention, no more than 3.4 defects per million opportunities occur. The name therefore describes a quality target, not just a method.

What is DMAIC?

DMAIC is the cycle for improvement projects on existing processes: define the problem and goal, measure the current state, analyze the causes, improve by implementing solutions and control to sustain the improvement. The standard ISO 13053-1 describes this approach.

What are Green Belts and Black Belts?

The belt colours denote roles and qualification levels in Six Sigma programmes. Green Belts contribute to projects or lead smaller ones, Black Belts lead improvement projects as the main person responsible, and Master Black Belts train and coach. Organizations and certification bodies draw the exact lines differently.

What is Lean Six Sigma?

Lean Six Sigma combines both approaches: Lean removes waste and speeds up flow, while Six Sigma reduces variation and defects with statistical methods. Together they aim to make processes both faster and more stable.