Lean glossary
Lean is an approach that grew out of the Toyota Production System. It puts value as seen by the customer first and systematically removes waste from processes.
Independent presentation. The original text is authoritative in each case.
Term hierarchy
- 5S
- A3 reportA3-Methode
- Andon
- Gemba
- Kaizen
- Lean constructionLean Construction
- Muda
- Mura
- Muri
- Obeya
- Poka-yokePoka-Yoke
- Policy deploymentHoshin Kanri
- Pull principlePull-Prinzip
- Shop floor managementShopfloor-Management
- Standardized workStandardarbeit
- Takt timeTaktzeit
- Toyota Production SystemToyota-Produktionssystem
- Value streamWertstrom
- Value stream mappingWertstromanalyse
Frequently asked questions
Where does Lean come from?
Lean goes back to the Toyota Production System, which emerged in Japan after the Second World War. The term lean production became widely known through the 1990 study The Machine That Changed the World by Womack, Jones and Roos, which compared Japanese and Western car manufacturers.
What are the basic principles of Lean?
Widely used are the five principles from the book Lean Thinking by Womack and Jones: specify value from the customer’s point of view, identify the value stream, create smooth flow, work according to the pull principle and pursue perfection through continuous improvement.
What counts as waste in Lean?
Waste, muda in Japanese, is any activity that consumes resources without creating value for the customer. Traditionally seven types are distinguished: transport, inventory, motion, waiting, overproduction, over-processing and defects. Some descriptions add unused employee skills as an eighth type.
Is there an official Lean standard or guide?
No. Unlike Scrum or PRINCE2, there is no body that defines Lean bindingly. Lean is a way of thinking with an extensive literature. Terms such as kaizen, value stream or pull are therefore shaped by standard works and practice rather than by a single guide.
How are Lean and agile working related?
Agile approaches take up many Lean ideas: short lead times, limited work in progress, pull instead of assignment and continuous improvement. Kanban grew directly out of Lean, and the 2020 Scrum Guide also names lean thinking as one of its foundations.