Hierarchical decomposition of project scope

Concept · 4 of 9 frameworks name this concept

The step-by-step breakdown of the entire project scope into ever smaller, manageable units until plannable work packages with clear responsibility emerge.

All frameworks at a glance

5 designations · 5 not yet reviewed
  • ISO 21506
    Work breakdown structurePreferred term · 3.96
    Product breakdown structurepartially overlappingbreaks down the result into sub-products instead of the work into work packages
  • PMI / PMBOK
    Work breakdown structureequivalentidentical understanding, more detailed rules on decomposition depth
  • PRINCE2
    Product Breakdown Structurepartially overlappingBreakdown into products rather than work; corresponds to the product breakdown structure under ISO 21506.
  • Scrum
    Product Backlogpartially overlappingalso decomposes the scope, but ordered by value rather than hierarchically
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Kanban
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed