Product Backlog or Work breakdown structure?

partially overlapping

In Scrum, the Product Backlog breaks down content, as a work breakdown structure does. It is an evolving list ordered by value rather than a hierarchy.

Comparison of Product Backlog and Work breakdown structure
ScrumProduct BacklogISO 21506Work breakdown structure
What it coversOrdered, continuously evolving list of all work intended to improve a product, and the Scrum Team's single source of workHierarchical decomposition of the entire project scope into ever smaller components, down to the work package.
Equivalent in PMI / PMBOK GuideWork breakdown structure partially overlappingWork breakdown structure equivalent
To the term pageProduct BacklogWork breakdown structure

All designations of this concept side by side