Product Backlog or Work breakdown structure?
partially overlapping
In Scrum, the Product Backlog breaks down content, as a work breakdown structure does. It is an evolving list ordered by value rather than a hierarchy.
| ScrumProduct Backlog | PMI / PMBOK GuideWork breakdown structure | |
|---|---|---|
| What it covers | Ordered, continuously evolving list of all work intended to improve a product, and the Scrum Team's single source of work | Deliverable-oriented breakdown of the entire project scope into levels down to work packages that together cover exactly this scope. |
| Equivalent in ISO 21506 | Work breakdown structure partially overlapping | Work breakdown structure equivalent |
| To the term page | Product Backlog | Work breakdown structure |