Closing stage of a project

Concept · 4 of 10 frameworks name this concept

The final stage of a project, in which results are handed over, contracts are closed, lessons are captured and the team and resources are released.

ConceptClosing stage of a projectTopic area Closing
Preferred term
cross-frameworkProject closurealso Project close-out
closely related
PRINCE2 · ProzesseClosing a projectProcess within the final stage rather than a stage of its own; also used for premature closure.
closely related
PM² · Abschnitte 3.2.4 und 8Closing Phasefixed phase after the Ready for Closing phase gate, with the Project-End Report
closely related
Six Sigma · ISO 13053-1:2011Control phaseCloses the project, but focuses on securing the improvement for the long term and handing it over to the process owner.
Concordance of the concept “Closing stage of a project”. The preferred term is the designation under which the glossary lists the concept.