Risk threshold or Risk tolerance?

closely related

Like risk tolerance, the risk threshold marks the limit beyond which action is taken. It is narrower and refers to a measurable level of exposure.

Comparison of Risk threshold and Risk tolerance
PMI / PMBOK GuideRisk thresholdISO 21506Risk tolerance
What it coversMeasurable level of risk exposure above which a risk is addressed and below which it may be accepted.Limit up to which a project may carry a risk; once the limit is crossed, a defined response has to follow.
To the term pageRisk thresholdRisk tolerance

All designations of this concept side by side