Hierarchical breakdown of resources
The tree-like breakdown of the resources needed in a project by type and category, such as staff, material and equipment, for planning and analysis.
Preferred term
ISO 21506 · 3.74Resource breakdown structure
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Resource breakdown structure
All frameworks at a glance
2 designations · 7 not yet reviewed
- ISO 21506Resource breakdown structurePreferred term · 3.74
- PMI / PMBOKResource breakdown structureequivalent
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Scrumnot yet reviewed
- Kanbannot yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed