Correcting a defective result
Concept · 2 of 10 frameworks name this concept
The action of modifying a defective or nonconforming work result so that it meets the requirements after all; it causes additional cost and time.
ConceptCorrecting a defective resultTopic area Quality equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Rework Concordance of the concept “Correcting a defective result”. The preferred term is the designation under which the glossary lists the concept.All frameworks at a glance
2 designations · 8 not yet reviewed
Frameworkfull overlappartialnone
- PMI / PMBOK
- general
- ISO 21506
- PRINCE2
- IPMA
- PM²
- Scrum
- Kanban
- Lean
- Six Sigma