Mind map or Mind mapping?

closely related

In the PMBOK Guide, mind mapping arranges ideas around a topic, as a mind map does. The term names the technique, while the mind map is its result.

Comparison of Mind map and Mind mapping
cross-frameworkMind mapPMI / PMBOK GuideMind mapping
What it coversGraphical representation of a topic in which subtopics and thoughts are arranged as branches around a central termVisual technique that arranges collected ideas radially around a central theme, revealing common ground, differences and gaps.
To the term pageMind mapMind mapping

All designations of this concept side by side