Shortening through parallel work

Concept · 2 of 10 frameworks name this concept

The schedule compression technique in which activities planned in sequence are performed wholly or partly in parallel, which increases the risk of rework.

ConceptShortening through parallel workTopic area Scheduling
Preferred term
cross-frameworkFast tracking
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Fast tracking
Concordance of the concept “Shortening through parallel work”. The preferred term is the designation under which the glossary lists the concept.