Description of work breakdown structure elements

Concept · 4 of 10 frameworks name this concept

The companion document to the work breakdown structure that describes the content, results, responsible parties, dates and effort for each of its elements.

ConceptDescription of work breakdown structure elementsTopic area Planning and project structure
Preferred term
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)WBS dictionary
partially overlapping
PRINCE2 · ManagementprodukteProduct DescriptionDescribes products rather than work and defines quality criteria, checking methods and responsibilities.
partially overlapping
cross-frameworkWork package descriptiondescribes a single work package, not all elements of the work breakdown structure
Concordance of the concept “Description of work breakdown structure elements”. The preferred term is the designation under which the glossary lists the concept.