Evidence that requirements are met
The confirmation, through objective evidence, that a result meets the specified requirements and specifications; the question is: was it built right?
Preferred term
cross-frameworkVerification
equivalent
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Verification
All frameworks at a glance
2 designations · 8 not yet reviewed
- PMI / PMBOKVerificationequivalent
- generalVerificationPreferred term
- ISO 21506not yet reviewed
- PRINCE2not yet reviewed
- IPMAnot yet reviewed
- PM²not yet reviewed
- Scrumnot yet reviewed
- Kanbannot yet reviewed
- Leannot yet reviewed
- Six Sigmanot yet reviewed