Setting costs by time and project component

Concept · 2 of 10 frameworks name this concept

The determination of which costs may be incurred when and for which parts of a project, as the basis for budget, cash outflow and cost control.

ConceptSetting costs by time and project componentTopic area Cost and economic viability
Preferred term
cross-frameworkCost planningalso Budget planning
partially overlapping
PMI / PMBOK Guide · PMI Lexicon of Project Management Terms 4.0 (2024)Cost management plandenotes the plan containing the rules for estimating, budgeting and controlling costs
Concordance of the concept “Setting costs by time and project component”. The preferred term is the designation under which the glossary lists the concept.

All frameworks at a glance

2 designations · 2 without counterpart · 6 not yet reviewed
  • PMI / PMBOK
    Cost management planpartially overlapping
  • general
    Cost planningPreferred term
  • Scrum
    no designation
  • Kanban
    no designation
  • ISO 21506
    not yet reviewed
  • PRINCE2
    not yet reviewed
  • IPMA
    not yet reviewed
  • PM²
    not yet reviewed
  • Lean
    not yet reviewed
  • Six Sigma
    not yet reviewed